Supply
The LPG transfer system (VTR) has been designed by MAKEEN Energy to load/unload large quantities of LPG from ships to storage tanks in LPG facilities.
The transfer system consists of numerous pieces of equipment such as pipes, hoses, valves, gauges and electrical components. The piping system includes emergency shut-off valves on liquid and vapour lines. These valves will automatically close during fires, gas leaks or other hazards.
The transfer system is located by the jetty/pier, where the vessel with LPG is docked before the unloading operation. LPG is normally pumped through the pipes with the help of LPG transfer pumps placed on the vessel.
Transfer from the LPG storage tank to the ship can also be done by using an LPG transfer pump from MAKEEN Energy.
The transfer system has a capacity of 160-200 m³ LPG per hour.
Benefits
- Robustly designed and protected (e.g. painted) for long-lasting performance
- Minimal wastage with the LPG liquid recovery system
Maximum safety level
- Emergency shut-off valves installed on liquid and vapour lines to isolate the LPG transfer system in case of hazards (fire, high leakage)
- Safety coupling system closes the ends of the two hoses and the piping in case of extensive tensions
- Improved safety with the potential equalisation system check prior to the loading/unloading operation
- An isolating spark gap system prevents lightning from travelling from the ship, through the hoses, and into the piping system
- ATEX-certified equipment for installations in hazardous areas